    • CommentAuthorlarge
    • CommentTimeJan 21st 2022
     
    Using standard tools, the Toiture Polycarbonate cover can be installed in less than two hours by two people. Installation is quick and straightforward to put into action. Toiture Polycarbonate is an excellent choice for this job because of its high impact resistance.  It also provides excellent insulation while still allowing light to pass through it. Installation of the polycarbonate cover is straightforward, thanks to the included instructions.  In a few hours, you can have your pergola, awning, and other structures up and running with only two people and no professional equipment. . . . Because of this, it now has the durability and aesthetics that it deserves. The process of fabricating  roof sheets is straightforward.  In two different flavors: creamy and clear, they are available to choose from.  Whatever their color or size, the first step in laying them is always the same: they must be properly prepared.  Therefore, after carefully peeling away the protective plastic from the top and bottom of the plate by a few centimeters, you must apply micro-perforated tape to the bottom of each plate and another full tape to the top of each plate to prevent the plates from sticking together. The installation of a profile base has been completed in its entirety. You will be able to install the first element on the structure after you have completed this preparation, which is the profile base or cover, once you have completed this step.  Afterwards, at 30-centimeter intervals, tighten the border outline around the entire surface that will be covered.  In order to secure the lid in place, finish this step by screwing the stopper into the end of the profile. (See the accompanying illustration. )Don't forget to drill holes in your plate to allow rainwater to freely flow through it. This is the method by which  panels are installed. Getting down to business and actually installing the  roof cover has finally arrived.  As a result, it is recommended that the side of the window that has been treated with UV light be placed facing the exterior of the building.  The plate must then be inserted into the edge profile that has already been installed and clamped into a second profile that has been screwed onto the other side of the plate to complete the installation.  Consequently, this operation can be repeated as many times as necessary to completely cover the roof's total surface area, if necessary.  Moreover, it should not be forgotten that the use of this  cover requires the addition of contouring or connecting covers between each new board that is inserted into the system. The only thing that must be done after all of the boards have been installed and tacked down is to remove the protective plastic film that was required to be placed on the outside of the  cover to protect https://fr.uvplastic.com/polycarbonate-roof-panels Toiture Polycarbonate. To complete the decking installation, tap the decking down with a mallet and place the sealing profile around the roof's circumference.  After that, you must drill holes every 15 to 20 cm in the louver profiles to ensure that the cells receive adequate ventilation.  This will take approximately 30 minutes.  It's important to note that the new profile models do not require any seals, which is a welcome improvement! Finally, a screw-in ridge should be installed on a sloped roof in order to prevent leaks.